Open house · Tuesday, November 10 · drop in any time, 3 to 7 p.m. · Grayslake

Tell IDOT: no bypass.
Fix the Route 120 we already have.

Five bypass routes on new land south of Route 120 are still on IDOT’s list. Show up on November 10 and tell IDOT to drop them. Comments close December 10.

IDOT is narrowing its options for Route 120 between Volo and Grayslake right now, and IDOT says public comment can still change which alternatives move on. Showing up and speaking out is how residents stopped the Route 53/120 tollway. It takes two minutes to send your comment.

Use webmail? Open the same email in Gmail, Outlook.com or Outlook for work or school.

Web calendar? Add it to Google, Outlook.com, Outlook for work or school or Yahoo.

On this page What to expect Why it matters What to say How to comment

IDOT’s Illinois Route 120 study: Public Meeting #2

When Tuesday, November 10, 2026, 3 to 7 p.m. It’s an open house: come any time and stay as long or as short as you like, even 15 minutes.

Where University Center of Lake County, 1200 University Center Drive, Grayslake, IL 60030. Directions

Comments due Thursday, December 10, 2026

Hosted by the Illinois Department of Transportation (IDOT). IDOT’s meeting page

When and where

What to expect

This is an open house, not a sit-down meeting. There’s no set start time and no need to stay for all four hours: come whenever it suits you between 3 and 7 p.m. and stay as long or as short as you like. Even a 15-minute stop to look at the maps and leave a comment counts. A five-minute presentation introduces the study, what has happened since the first public meeting in April 2024, and the alternatives IDOT is weighing. After that you can walk the room at your own pace: exhibit boards, corridor maps of the alternatives, and members of IDOT’s study team to answer questions. You can leave a written comment before you go.

Look before you go

IDOT has posted draft versions of the meeting materials. If you live south of Route 120, start with the bypass map and look for your street.

Can’t make it on November 10? The same materials are online, and IDOT takes comments by email or mail until December 10. If you need an accommodation to attend, write to the study team at [email protected] ahead of time.

Strip map of the Illinois Route 120 study corridorRoute 120 runs 9.3 miles from IL 60 in Volo east to Almond Road in Grayslake. Cross streets: IL 60 at mile 0, IL 134 at mile 4.5, IL 83 at mile 6.5, US 45 at mile 7.9, Almond Road at mile 9.3. Rail lines cross at grade near IL 134 and just west of IL 83. Bypass options IDOT is studying would run south of the existing road.to US 12to I-94Bypass options IDOT is studying run south of today’s road (alignment shown schematically)Rail crossings at gradeCN lineIL 60VoloStudy beginsIL 134Hainesville4.5 miIL 83Grayslake6.5 miUS 45Grayslake7.9 miAlmond RdGrayslake9.3 miStudy endsStrip map of the Illinois Route 120 study corridorRoute 120 runs 9.3 miles from IL 60 in Volo east to Almond Road in Grayslake. Cross streets: IL 60 at mile 0, IL 134 at mile 4.5, IL 83 at mile 6.5, US 45 at mile 7.9, Almond Road at mile 9.3. Rail lines cross at grade near IL 134 and just west of IL 83. Bypass options IDOT is studying would run south of the existing road.West: to US 12East: to I-94Bypass options (schematic)IL 60Volo · study beginsIL 134Hainesville · 4.5 miRail crossing nearbyIL 83Grayslake · 6.5 miCN rail crossing just westUS 45Grayslake · 7.9 miAlmond RdGrayslake · 9.3 mi, study ends

9.3 miles, two rail crossings at grade, 1,263 crashes from 2017 to 2021 by IDOT’s count. Tap a road, a rail crossing or the bypass line to see what is there.

Route 120 study corridor, Volo to Grayslake. Mileage measured from IL 60. Cross streets are placed to scale; rail crossings are approximate; the bypass line is schematic. Sources: IDOT IL 120 PEL Study; Illinois route log.

Why it matters

Why your voice counts now

The bypass is still on the table, and the list of options has not been cut yet.

The options are being narrowed now

IDOT started with 11 bypass alternatives on new land. Its first round of screening recommends that five of them move on, along with seven alternatives on today’s road and 17 spot improvements at six locations. IDOT says these are recommendations that can change in response to public comment. Its next public meeting, planned for spring 2027, will show which alternatives it intends to carry forward.

Residents have pushed back before, and it shows

165 people came to the first public meeting in April 2024. In IDOT’s own summary of its Community Advisory Group meeting in April 2026, which drew 95 people, the feedback includes support for alternatives on the existing road and opposition to the bypass alternatives. Earlier, the group asked IDOT to protect homeowners near Route 120. A full room and a stack of comments on November 10 tell IDOT that hasn’t changed.

The land south of Route 120 can’t be replaced

The bypass routes cross wetlands, flood-prone ground and forest preserves, including Almond Marsh and the Liberty Prairie Reserve. On the bypass map IDOT showed its advisory group in August 2025, one line crosses the open land between the Prairie Crossing neighborhood and Route 120 before continuing east through Almond Marsh Forest Preserve. Once a highway is built there, that land does not come back. Why we oppose the bypass

What to say

What to tell IDOT

The most important thing to tell IDOT is No Bypass. If you don’t want the bypass, say so plainly, near the top of your comment. Then tell IDOT, in your own words, why stopping it matters to you. Would it hurt your home’s value or your quality of life? Would it harm your community? A short personal comment carries more weight than a form letter.

Reasons you can give:

  • It’s unaffordable. It would cost at least $2 billion, and we can fix existing Route 120 for a fraction of the cost.
  • It won’t fix congestion. New roads draw new traffic, which planners call “induced demand,” or what we like to call “if you build it, they will come.” IDOT’s own traffic modeling shows the bypass would add several thousand cars a day to existing Route 120 and bring heavy congestion where it begins and ends.
  • Better, cheaper fixes exist. An overpass at Routes 120 and 83, roundabouts, coordinated signals, intersection improvements and widening where the communities support it would reduce congestion and improve safety at a fraction of the cost. The villages along Route 120 have a plan for fixing the existing road, the Belvidere Road Corridor Capacity Plan, and we support it.
  • There are more ways to move traffic. We also support an overpass at Peterson Road and US 45 and widening Peterson Road near Route 60. Route 60 is already planned to widen to four lanes between Route 176 and Route 120, which adds another east–west route.
  • Keeping the bypass in the plan blocks real fixes. As long as IDOT thinks it might someday build the bypass, it won’t invest in improving existing Route 120, which has been the case for decades.
  • It would increase flooding. Much of the bypass area is in flood hazard zones. Paving over them increases the risk of flooding.
  • It would be environmentally devastating. It would cut through Illinois natural areas and Lake County forest preserves, a 3,300-acre nature preserve, major streams and some of the region’s highest-quality wetlands (including a wetland mitigation bank), grassland and migratory bird habitat, and habitat for 43 state- and federally listed threatened and endangered species.
  • It rests on inflated numbers. The case for the bypass relies on population projections far higher than the growth the area has actually seen: 15 times the growth of the past several decades.
  • It repeats the problems of existing Route 120 instead of fixing them.
  • It is unwanted and politically unpopular. IDOT’s own summary of its Community Advisory Group feedback shows opposition to the bypass alternatives.
  • Fix what we have. Illinois roads already need repair. IDOT should fix them, not build a road it can’t afford and would have to maintain forever.

For the full case, see Fix Route 120 in place.

How to comment

Send IDOT your comment by December 10

IDOT’s public comment period is open now and runs through Thursday, December 10, 2026. You don’t have to wait for the meeting: you can send your comment today. Whichever way you comment, make sure it says No Bypass. Any of these counts:

Three ways to comment

  • At the meeting: fill out a comment form on November 10.
  • By email: [email protected]
  • By mail: Illinois Department of Transportation, Attn: Bureau of Programming, Corey Smith, P.E., 201 W. Center Court, Schaumburg, IL 60196-1096

Questions for the study team: Corey Smith, IDOT District 1, (847) 705-4103.

Use webmail? Open the same email in Gmail, Outlook.com or Outlook for work or school.

Help us bring neighbors to the meeting

We read every IDOT document, show up at every meeting and make sure residents know when to speak. Your gift pays for that work, and volunteers help us spread the word.

Sources